A lot happening at our home the past month! This will probably be my final little peak at the construction until after we're moved in. Our closing date is set for May 20th and we will be moving in on the 21st. Pinch me!!
Our stairs are no longer covered up. They will be getting stained/painted this week. Light fixtures, plumbing fixtures, and door knobs are all being installed now.
We will be painting these french doors black after we move in:
Our mudroom/laundry room floors are complete and so beautiful. Bjorn went out there yesterday to put a sealant on them.
Our kitchen is really coming along. Still waiting on a few cabinets to come in that were ordered incorrectly. But here is a peak of a couple different angles. We went with a brick backsplash behind the range which matches the brick fireplace, and a waterproof shiplap backsplash behind the sink.
After we move in, we will be installing two sets of floating shelves on either side of the sink window. We acquired beautiful wood planks from a local carpenter that said they are from a tree that fell right in town.
Our primary bathroom is so lovely to me. I cannot wait to take a bath in this tub. I didn't want our bathroom to be too white, so we opted for the natural wood vanity and a darker grout. One thing that was so difficult for us in our old house was keeping our white grout clean!
So many things still have paper or a tarp over it but once we are moved in and unpacked, I will definitely share more about the finishes we chose. Thank you for following along!! xo